Dossiers of application for permission to build house in rural area must have drawings of foundations, the main stand and the project on a scale from 1/50 to 1/500.
For private house in urban area, additional drawings of the floor, the facade and the main section of the house on a scale from 1/50 to 1/200 must be provided.
The Licensing authority for housing construction in rural area belongs to the commune-level of the people’s committee In urban area, it belongs to the district level of the people’s committee.
Contents are defined in Circular 10/2012/TT-BXD guiding Decree 64/2012/ND-CP and takes effect from February 6th 2013.
A construction practicing certificate in Vietnam is not only a personal qualification paper. Many foreign…
Turkey has opened an anti-dumping investigation on solar glass from Vietnam, China, and Malaysia. The…
Foreign engineers, construction managers, designers, supervision consultants, and cost managers working on construction projects in…
On June 16, 2026, Turkey opened an anti-dumping investigation on polyester tire cord fabric from…
A work permit for foreign engineers in Vietnam is not just a matter for the…
A company can be commercially right and still present a weak arbitration case. In evidence…
This website uses cookies.